However, this rule doesn't apply to levels and views. When a new wall type is needed, the "wall type" project is opened and the desired wall is copied and pasted into the current project.Įveryone knows that a Revit template should be as clean as possible, and it should contain the basic company standards and a few families. In this case, you can set up project files that have one instance of each wall type created in each. Some items, such as walls, cannot exist outside of a project file.Only load the essentials into your template too much can make your starting template way too big and cluttered.Some schedules are only for the design team and never go on a sheet.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |